15 Nov November 2012
Progress has been steady during November. The white base coat above the waterline has been applied. Below photos taken on December 4th, showing Shipwright “Brecken,” assisted by Mike Gonzales, at work on deck beams and footwell. The fuel tank is being fabricated of stainless steel by Dennis Thompson (not shown), and will be installed before the aft deck is laid. Photos below by Fredy and Sherry Champagne and (bottom row) by Nate Lomba and Chuck DeWitt.